On Sunday, Brian and Henry started the install process. They started with organizing the layout of the gallery space. They lined the floor with the work in correspondence where they would be hung on the wall. They also patched up the wall to make it white and cover up holes from previous work.
The pedestal and ancestry wall were also both painted by in the clay red so that it would be ready for install Monday by Brian and Henry. Touch up painting was done Monday morning by Marissa and Leane.
On Monday morning, Leane and Rachel O. set up the centerline on the wall. They wall was prepped with tape as a guideline of where the work will go. The centerline helped so that all the work would be easier to hang with a measurement where to center the works.
Bobby and Katie worked on scraping up old paint from the floor and tidying up the floor.
Brian, Henry, Leane, Rachel H., Bobby and Katie worked on hanging the work for the show. Throughout the day there were a few changes made to the gallery. Some of the work got rearranged in the room during install. Katie put up the labels that Leane made. Rachel H. organized the packaging that was protecting the work so that they could be used during de-install.
Rachel O. worked on the gift for Susan and Marissa worked on the wall text of the ancestry for the exhibit. Rachel O. is also working on prepping the food for the opening on Thursday with Katie. Bobby finished the catalogues and the rest of the writing for the exhibit.